How Destructive Termite Can Be, Find Out More About Termite Control

Different methods used for TERMITE CONTROL

CORRECTIVE SOIL TREATMENT

1st Stage Drilling
To enable pesticide to form the ‘Barrier Treatment’, drilling is of paramount importance. Holes of ‘16 mm’ in diameter are drilled 4 inches from the vertical wall and spaced 18 inches apart and 420 mm in depth or till the drill bit touches soil.
2nd Stage CHEMICAL INJECTION
Approximately 5 liters of insecticide/water mixture is pumped into the ground at each drilled-hole.
3rd Stage PATCHING
Once chemicals have been pumped into the ground these holes will be filled with a colored cement mix to match the general appearance of the floor-surface.